Gravel for Shed Base Calculator

Gravel Calculator

Volume = length × width × depth. 1 cubic yard = 27 cubic feet. Tons depend on material density, so the density used is shown in the result.

Area: - sq ft
Volume: - cubic yards
Weight: - tons
To order (with waste and compaction): - tons / - cubic yards
50 lb bags: -
Material cost: $-

Estimate only. Density varies by quarry and moisture. For large orders, confirm with your supplier's scale ticket. Delivery, minimum order and labour are usually extra.

Plan a level, compacted gravel pad for a shed.

Spec

Crusher run, 4 inches, compacted, the usual starting point, with a timber or concrete edge.

Measure

Measure the shed footprint plus a small margin. Check the ground is level before delivery.

Warning

A shed on soft, uncompacted gravel will settle unevenly.

Estimate only. Confirm with your supplier before ordering.