Gravel Calculator
Gravel Calculator
Volume = length × width × depth. 1 cubic yard = 27 cubic feet. Tons depend on material density, so the density used is shown in the result.
Estimate only. Density varies by quarry and moisture. For large orders, confirm with your supplier's scale ticket. Delivery, minimum order and labour are usually extra.
What is a gravel calculator?
A gravel calculator works out how much gravel you need for a project, in cubic yards, tons, bags, and cost, before you order. You enter length, width, and depth, pick a material, and it converts area and depth into volume, then volume into weight using that material’s density.
This matters because gravel is not bought by the bag for a driveway or patio, it is bought by volume or weight, usually cubic yards or tons, and the same volume weighs a different amount for different materials. Pea gravel, crushed stone, crusher run, and river rock all have different densities, so a calculator that hides density will give you a wrong tonnage even if the volume is right.
How to calculate gravel
Tons = cubic yards x density (tons per cubic yard)
Start with area in square feet, length x width. Multiply by depth in inches, divide by 324, and you have cubic yards. Multiply cubic yards by density and you have tons. One cubic yard is 27 cubic feet, and one 50 lb bag is 0.5 cubic feet, so one cubic yard needs 54 bags.
- Measure length and width in feet. For an irregular area, split it into rectangles, calculate each one, and add them up.
- Pick a depth in inches for your project, and pick a material first, because density changes the tons.
- Calculate cubic yards with length x width x depth / 324.
- Convert to tons with cubic yards x density, using the density shown in the calculator.
- Add waste for spillage and uneven ground, and compaction separately for layers that will be compacted, then check bags and cost.
Gravel worked examples
Worked example: a patio 10 feet by 20 feet, 3 inches deep, is (10 x 20 x 3) / 324 = 1.85 cubic yards. At 1.40 tons per cubic yard for crushed stone #57, that is 2.59 tons, or 2.85 tons with 10 percent waste. At $40 per ton, material cost with waste is about $114.
| Project | Size and depth | Cubic yards | Tons, #57 at 1.40 |
|---|---|---|---|
| Patio | 10 x 20 ft, 3 in | 1.85 | 2.59 |
| Garden path | 3 x 30 ft, 2 in | 0.56 | 0.78 |
| Driveway surface | 12 x 50 ft, 3 in | 5.56 | 7.78 |
| Shed base | 10 x 12 ft, 4 in | 1.48 | 2.07 |
| Decorative bed | 10 x 15 ft, 2 in | 0.93 | 1.30 |
Use the table for a quick check, and use the calculator for your exact size, material, waste, and compaction, because those change the order.
Gravel density: why tons vary
There is no single tons-per-yard number for all gravel. Density depends on material, stone size, and moisture. Wet gravel weighs more than dry gravel, and a quarry’s scale ticket is final for a large order. Use these planning ranges, and confirm with your supplier for a big delivery.
| Material | Tons per cubic yard | Best for |
|---|---|---|
| Pea gravel | 1.25 to 1.50 | Paths, beds, decorative areas |
| Crushed stone #57 | 1.35 to 1.45 | Driveway surface, drainage |
| Crusher run / dense grade | 1.42 to 1.60 | Driveway base, shed pads |
| River rock | 1.30 to 1.35 | Decorative beds, drainage |
| Sand, dry | 1.30 to 1.50 | Paver base, leveling |
| Topsoil, dry | 1.00 to 1.30 | Raised beds, lawn topdressing |
How deep should gravel be?
Depth depends on the project, the soil underneath, and whether the layer will carry vehicles or just feet. Use these starting points, then adjust for your soil and use.
| Project | Depth to plan | Material |
|---|---|---|
| Garden path | 2 to 3 inches | Pea gravel or #57 |
| Patio surface | 2 to 3 inches, plus 4 inch base if layered | #57 over crusher run base |
| Driveway surface | 2 to 4 inches | #57 |
| Driveway base | 6 to 8 inches | Crusher run, compacted |
| Shed base | 4 inches | Crusher run, compacted |
| French drain fill | Fill trench to grade | Washed #57 around pipe |
| Decorative bed | 2 to 3 inches | Pea gravel or river rock |
How much area does a yard of gravel cover?
One cubic yard covers 324 square feet at 1 inch deep, 162 square feet at 2 inches, 108 square feet at 3 inches, and 81 square feet at 4 inches. One ton covers about 100 square feet at 2 inches, depending on material. If your area is bigger than that, you need more than one yard, and bulk delivery is usually cheaper than bags.
Bags vs bulk gravel
A 50 lb bag is 0.5 cubic feet, so one cubic yard needs 54 bags. Bags make sense for small jobs under about half a cubic yard, for example topping up a path or a small bed. For anything bigger, bulk delivery is usually cheaper, even after a delivery fee, and it is much faster to spread. Check truck access before you book bulk delivery, because a full dump truck needs room to turn and tip, and soft ground can be a problem after rain.
Gravel layers: driveway, patio, and shed base
For a driveway, build in layers, not one thick loose layer. Start with a compacted crusher run base, 6 to 8 inches, with about 15 percent compaction, then a surface layer of #57 stone, 2 to 4 inches, with about 10 percent compaction. Calculate each layer separately in the gravel calculator, then add them for total tons and cost. A driveway 12 x 50 ft, base 6 inches plus surface 3 inches, needs about 11.11 cubic yards for the base and 5.56 cubic yards for the surface, before waste.
For a patio, plan 4 inches of compacted crusher run base, then 2 to 3 inches of pea gravel or #57 surface, and edge the patio so gravel stays in place. For a shed base, plan 4 inches of compacted crusher run, measure the shed footprint plus a small margin, and check the ground is level before delivery. A shed on soft, uncompacted gravel will settle unevenly.
Waste vs compaction: keep them separate
Waste covers spillage, uneven ground, and edges that are hard to measure. Compaction covers how much a loose layer settles when it is compacted. They are different, and adding them together as one number hides which one you changed. The calculator keeps them separate, so you can set waste for spillage and compaction for a base layer, and see the total to order for each.
Common gravel mistakes
- Measuring area once, in feet, but depth in the wrong unit, so the volume is off by a factor of 12.
- Using one density for every material, so pea gravel and crusher run give the same tons, when they should not.
- Forgetting waste and compaction, then running short on the last load, which costs a second delivery fee.
- Ordering one thick loose layer for a driveway, instead of a compacted base plus a surface layer.
- Comparing a price per ton with a price per yard without converting by density.
How to order gravel without getting short
Measure the area twice. Pick the material first, because density changes the tons. Keep waste and compaction separate. Ask your supplier: price per ton or per yard, delivery fee, minimum order, and whether the price is by weight on a scale ticket or by volume. Check truck access, and check whether the delivery can be tipped where you need it, or whether you will have to wheelbarrow it a long way.
Related gravel calculators
Pea Gravel Calculator Coverage, tons, and bags
Gravel Driveway Calculator Base plus surface, layered
Gravel Types Compared Pea, #57, crusher run, river rock
Cubic Yards to Tons Convert volume to weight by material
Cubic Feet and Yards Volume hub for all materials
Gravel for a Patio Depth, base, and material
Gravel for a Path Depth and edging
Gravel for a Shed Base How thick, and what material
Gravel for a French Drain Trench volume and fill
Frequently asked questions
How much gravel do I need for a driveway?
Measure length and width in feet, choose a depth, and use cubic yards = length x width x depth in inches, divided by 324. Plan a base layer plus a surface layer, not just one loose layer, and add waste for spillage.
How many tons are in a cubic yard of gravel?
It depends on material. Pea gravel is about 1.25 to 1.50 tons per cubic yard, crushed stone #57 about 1.35 to 1.45, and crusher run about 1.42 to 1.60. The calculator shows the density it is using.
How many bags of gravel in a cubic yard?
54 bags of 50 lb gravel, because one cubic yard is 27 cubic feet and each bag is 0.5 cubic feet. Round up, and add waste.
How deep should gravel be for a driveway?
Plan a 6 to 8 inch compacted crusher run base, plus a 2 to 4 inch #57 surface layer. One thick loose layer will rut and move.
Is delivery included in the gravel price?
Usually not. Ask about delivery fee, minimum order, and truck access before you book delivery.
Is this calculator an exact quote?
No. These are estimates for planning. Prices, density, and moisture vary by supplier, region, and date. Confirm final price and quantity with your supplier.
Estimate only. Confirm with your supplier before ordering.